EBPE III, Minera Escondida
- Project name
Pump System Electromechanical Assembly for new Bioleaching piles of EBPE III, Minera Escondida Project.
- Location
Región de Antofagasta - Antofagasta
- Client
Minera Escondida.
- Stage
Completed.
- Description
Bioleaching Pile Work including assembly, grooving and connections.
S/E SX Works where extend it capability and at S/E Booster including civil Works, stringing conductors, assembly, connections and tests.
A 69kV transmission line from SX S/E to Booster S/E Pumps.
All of the above consider EPC format electromechanical assembly Works.
The length of the project was 23 months finishing at June 2013.